| Category | Cars |
|
|||
| Created | 2019-04-04 | ||||
| Owner | juniperqq | ||||
| Title | Construction advice given by geotextile suppliers | ||||
| Description | The textured hdpe geomembrane supplier remind the majority of constructors: the geomembrane and composite geomembrane should pay attention to the stability of various parameters before construction, including the following: 1. The geomembrane coil should be protected from damage before installation. The hot sale hdpe geomembrane should be piled up in a place where there is no water accumulation, the height of the pile should not exceed four rolls, and the identification piece of the roll can be seen. Geomembrane rolls must be covered with opaque materials to prevent UV aging. During the storage process, the integrity of the label and the integrity of the data should be maintained. 2. The stitched hot sale hdpe geomembrane pond liner joints most include a line and a chain lock chain stitching method. The thread used for stitching shall be a resin material with a minimum tension of more than 60 N and resistance to chemical and UV rays equivalent to or exceeding that of the geomembrane. 3. The worn geomembrane must be repaired by laying and thermally joining the geomembrane pieces. The geomembrane piece is at least 200 mm longer than the edge of the defect in all directions. The thermal connection must be strictly controlled to ensure that the geomembrane patch and the geomembrane are tightly bonded and that the geomembrane is not damaged. 4. At the bottom of the landfill, if the length of the crack exceeds 10% of the width of the coil, the damaged part of the composite geomembrane must be cut off, and then the two parts of the geomembrane are joined. | ||||
| Consumption | |||||
| Broken | No | ||||
| Price | |||||
| Promotion level | None | ||||
|
|
|||||
Please register or log in.
